Projects

Projects施工実績

From renovating electronics stores that stay open to a new large store by a station, factories, hospitals and welfare facilities, and apartment buildings. Here is the electrical work we have handled. Our renovation & maintenance work for electronics retail stores covers 12 prefectures from Kanto to Chugoku. Filter by use, type of work and prefecture.

Light fixtures lined up on a high factory ceiling

From sales floors that stay open
to new-build sites.営業中の売場から、新築の現場まで。

Our track record centers on renovation & maintenance for electronics retail stores. At stores in many regions, we have handled LED upgrades, changes and additions to sales-floor lighting, and upgrades to exit sign lights and automatic fire alarm systems.

In new construction, we have handled the electrical systems for a large electronics retail store in a station-front redevelopment building, a welfare facility, a clinic and rental apartments. On sites where our group company SOWA SERVICE handles air conditioning and mechanical systems, we take on the electrical work.

12 prefecturesArea of our renovation & maintenance work for electronics retail stores (Kanto to Chugoku)
approx. 6,400 m²Sales floor area of the new electronics store we worked on
4 categoriesMain feeders & power / Lighting & outlets / Low-voltage & communications / Fire & life-safety systems
Since 2015Founded in Nagoya

Area

Prefectures we have worked in施工した都府県

From our head office in Nagoya, we go to sites from Kanto to Chugoku.

Kanto
TokyoKanagawaSaitamaChibaTochigi
Koshin
Nagano
Tokai
ShizuokaAichiGifuMie
Kinki
Shiga
Chugoku
Tottori

All Projects

Project list実績一覧

Filter our main projects by use, type of work, work category and prefecture. Years show the approximate time of the work. Client and building names are not published.

StoresNew build2016

New large electronics retail store

Tokyo

Main feeders, power, lighting, outlets, low-voltage, PA

Sales floor approx. 6,400 m², 5 floors. From 2018 to 2025, we also handled electrical repairs and added circuits for the same store.

StoresRefurbishment2019–2024

Electronics retail stores: LED lighting upgrades

Aichi, Gifu, Shizuoka, Mie, Shiga, Chiba, Saitama, Tochigi, Tokyo and others

Lighting

Replaced sales-floor fixtures, high-ceiling lights, downlights and eave lights with LEDs.

StoresMaintenance2021–2022

Electronics retail stores: exit sign light and automatic fire alarm system upgrades

Aichi, Kanagawa, Mie

Fire & life-safety systems

Replaced about 30 exit sign lights, replaced exit sign batteries, and refurbished automatic fire alarm and firefighting systems.

StoresMaintenance2021–2022

Electronics retail stores: added power for TV sections and replaced TV distribution boards

Aichi

Outlets & distribution boards

Added power for display TVs and replaced the distribution boards that serve them.

StoresRefurbishment2021–2022

Electronics retail stores: power work for display fixture changes

Saitama, Chiba, Shizuoka, Aichi

Outlets

Relocated and added power to match changes in sales-floor fixtures.

StoresMaintenance2021–2022

Electronics retail stores: sign lights, outdoor lights and high-mounted lighting refurbishment

Aichi, Mie, Saitama, Shizuoka, Chiba

Lighting

Replaced sign lights, parking lot lights and high-mounted fixtures, and refurbished the lighting timers.

StoresRepair2021–2022

Electronics retail stores: leakage investigation and main switch replacement

Aichi, Shizuoka, Mie

Main feeders & power

Investigated and repaired current leakage in atrium lighting; replaced main switches and earth leakage alarms.

StoresRepair2020

Electronics retail store: escalator current leakage

Shizuoka

Power

Found the cause of the leakage and repaired it.

StoresRefurbishment2024, 2026

Store and bookstore renovations

Nagano

Full electrical scope

Renovated a store in 2024 and a bookstore in 2026. In both cases, we handled all the electrical work alongside air-conditioning work by our group company SOWA SERVICE.

StoresNew build2024

New restaurant

Aichi

Electrical

Handled electrical work, including lighting and outlets, for a new restaurant.

Factories & officesRefurbishment2026

Office renovation

Kanagawa

Full electrical scope

Handled all the electrical work alongside work by our group company SOWA SERVICE.

Factories & officesNew build2021–2022

New business premises

Aichi

Electrical systems

Handled the electrical systems for new business premises.

Factories & officesRefurbishment2020–2022

Factory machine wiring

Aichi, Gifu, Mie

Power

Power supply and machine wiring for production equipment.

Factories & officesRefurbishment2022–2024

Logistics warehouse: machine connections and power work

Aichi

Power

Connected warehouse machinery and carried out power work on the 2nd floor.

Factories & officesRefurbishment2020

Logistics office: power for ventilation fans

Aichi

Power

Factories & officesRefurbishment2022

Main feeder refurbishment in a tenant building

Aichi

Main feeders

Factories & officesRefurbishment2020–2022

Power work for air-conditioner replacements

Aichi

Power

Alongside air-conditioning work by our group company SOWA SERVICE, we installed new and additional power supplies for air conditioners and dehumidifiers at factories, nursery schools, offices and other sites.

Hospitals & welfareNew build2020

New hospital

Gifu

Electrical

Hospitals & welfareNew build2021–2022

New welfare facility

Aichi

Electrical systems

Two-story wooden building. SOWA SERVICE handled air conditioning, ventilation, plumbing and fire suppression; we handled the electrical work.

Hospitals & welfareRefurbishment2021–2022

Renovation of a facility for people with disabilities

Aichi

Electrical & fire safety systems

Electrical and fire safety systems on the 1st floor.

Hospitals & welfareNew build2023–2024

New clinic

Aichi

Electrical systems

Handled everything from temporary power to the electrical systems for a new clinic.

Nursery schoolsRefurbishment2020–2022

Nursery school refurbishments: electrical systems

Aichi

Electrical

Handled electrical systems and added outlets for renovations at several nursery schools.

Schools & publicRefurbishment2021–2022

Electrical systems for high school restroom refurbishments

Aichi

Lighting & outlets

Public works. Electrical systems for restroom refurbishments at 3 schools.

PublicRefurbishment2022

Lighting replacement at a historic site

Aichi

Lighting

Public works.

SchoolsRefurbishment2020

Power for air conditioning at a university research facility

Aichi

Power

Power work for an air-conditioning upgrade.

Apartment buildingsNew build2023–2024

New rental apartment buildings (2 buildings)

Aichi

Electrical systems

Handled everything from temporary power to the units' electrical systems and TV reception.

Apartment buildingsNew build2022

Intercom system for an apartment building

Aichi

Low-voltage

Apartment buildingsRefurbishment2019

Added outdoor outlets at a condominium

Aichi

Outlets

Construction sitesNew build2022–2024

Temporary power for construction sites

Tokyo, Aichi

Main feeders & power

Installed temporary power for construction at the start of new building projects.

These main projects are drawn from our internal records, such as our construction history statements. Client and building names are published only with permission.