Issue
Across five sales floors, a great deal of electrical equipment, from lighting and outlets and power for display TVs to POS/LAN and security camera wiring, had to be in place by opening day.
Action
From April to May, we ran the wiring for main feeders, lighting and outlets, and low-voltage systems on each floor and installed the distribution boards. In November, before opening, we added crew to finish the work.
Result
The electrical systems on all five floors were in place in time for opening. After opening, from 2018 to 2025, the same store continued to ask us for electrical repairs, added circuits and sales-floor renovations.